M&S Chiswick
Adaption of existing foodhall to extend into three adjacent units
Project Overview
Adaptation of an existing food hall to facilitate its expansion into three adjacent retail units. The project involved the reconfiguration and integration of the existing food hall with the neighbouring spaces to create a larger, cohesive retail environment.
Client
Marks & Spencer
Contractor
Gondola Pro
Location
London
Fabricator
Brooker Flynn
Project Description
The project comprised the adaptation and extension of an existing M&S Foodhall to extend into three adjacent retail units. The works required extensive structural alterations and careful coordination to integrate the existing buildings into a single, cohesive retail environment.The structural design included permanent support works, new foundations, and a detailed temporary works scheme to facilitate the safe removal of the existing internal separating walls between the units.The project also included the structural detailing of a heritage shopfront on a prominent high street frontage. Care was taken to preserve the architectural character of the existing façade while accommodating the structural modifications required for the proposed alterations.Structural support works were designed for new and modified roof-mounted mechanical plant, including the assessment of the existing roof structure, the design of secondary steelwork, and coordination with the mechanical services design to ensure adequate load transfer, maintenance access, and long-term structural performance.The scope further included the design and detailing of modifications to the existing drainage infrastructure to suit the revised store layout.
Project Challenges
The age and varied construction of the existing buildings, combined with the limited availability of original structural information, presented significant design challenges. Extensive intrusive investigations and site surveys were undertaken, the findings informed the detailed design of new permanent structural support beneath existing loadbearing walls, accommodating variations in wall alignment, construction materials, and foundation arrangements across the interconnected buildings.The sequencing was driven by the phased removal and abatement of ACMs in advance of opening up for measured surveys.The extensive removal of existing internal walls necessitated a comprehensive assessment of the buildings' overall lateral stability. Detailed structural analysis was undertaken to evaluate the impact of the proposed alterations on the existing load paths and stability systems, with new structural elements and tying arrangements designed to provide robust horizontal load transfer between the previously separate buildings.