Lidl Accrington

ABOUT PROJECT

Working with a design & build contractor at tender stage, MP Consulting supplied the pre-tender structure design, which assisted the securing of contract works through open competitive tender. MP Consulting provided the full structural design of foundation, floor slab, structural concrete frame and steel trussed roof. On a partly prepared site, MP Consulting finalised the ground improvement works and additionally engineered a drainage scheme to discharge planning conditions and to accommodate a SUDS storage tank.

PROJECT DETAILS

  • CLIENT
    Lidl Accrington