Kestrel Fields

ABOUT PROJECT

Detailed ground modelling of the existing surface to include proposed formation levels and finished levels was undertaken in auto desk civil 3D. The ground modelling was used to set the site levels in conjunction with the architect, which satisfied planning and highways requirements while at the same time providing the client with minimum off site spoil. With input from tender through to construction stages, MP Consulting Engineers provided detailed modelling of surfaces with 3D output conveyed to the contractor for use in the GPS systems on the site plant. As part of the civils design, MP Consulting Engineers completed a SUDS scheme utilising combinations of porous surface, stone filled carrier drains and hydrobrake attenuated tank to achieve storm resilience in excess of a 100 year return period.

PROJECT DETAILS

  • CLIENT
    Kestrel Fields