Brownhills Stoke

ABOUT PROJECT

A new build academy facility for 1050 students in Stoke on Trent. MP Consulting provided a detailed structure design of the steel frame, upper cast insitu floors, elevation support and feature wall details. Construction began in 2011, the school opened in 2012. The school comprises a multi level education facility, with double height performance hall including stage area and gymnasium block appended to the campus. Project timescales required rapid turn around of structure design information, with structure model formed at early stage to allow material order, and with details concluded in line with the fabrication sequence.

PROJECT DETAILS

  • CLIENT
    Brownhills Stoke